project
|
Conventional outdoor substation
|
Prefabricated cabin style substation
|
Land occupation area
|
Approximately 3000 square meters
|
Approximately 2000 square meters
|
Construction cycle
|
About 3-4 months
|
The entire station is pre-installed as a
whole, with all equipments prefabricated
in the factory and installed on site. The
construction period is short: 1-2 months
|
Cable usage
|
Equipment is arranged in a scattered
manner, with a large amount of primary
and secondary cables used
|
The equipment is highly integrated and
arranged, reducing electrical distance and
saving about 30% of cables
|
Environmental requirements
|
High environmental requirements, harsh
environments such as sandstorms and
condensation pose will provide significant
risks to thr equipments
|
Adopting an all-metal cabin design with IP54 as
the level of protection, equipped with a complete
HVAC system, able to prevent wind, sand,
condensation and improve the equipment reliability
|
Construction and management costs
|
There are many buildings and high construction
costs; the equipments are provided by different
manufacturers, resulting in high costs on
coordination and management
|
Prefabricated design, eliminating buildings throughout the entire
station, resulting in low construction costs; all equipment is
provided by Changsong Electric and responsible for all installation
and commissioning work, with low management costs
|
Operation and maintenance costs
|
Open design, greatly affected by
environmental factors, high operating and
maintenance costs
|
Closed design, basically unaffected by
external conditions such as environment,
low operation and maintenance costs
|